Run your 4L80E swap on a 4L60e tune with no segment swap
#46
I have a gauge for that
iTrader: (42)
So I realize this thread is controversial and a bit irrelevant since the useful data isnt there...but to my point
There were two sets of directions; one with PWM and one without. What are the effects, specifically of torque converter behavior of using the non-pwm wiring setup with only a single relay versus using the two relay pwm method? Should lockup basically be on/off and operate normally using the single relay, or are both needed for full torque converter lockup?
There were two sets of directions; one with PWM and one without. What are the effects, specifically of torque converter behavior of using the non-pwm wiring setup with only a single relay versus using the two relay pwm method? Should lockup basically be on/off and operate normally using the single relay, or are both needed for full torque converter lockup?
#47
Gingervitis Addict
iTrader: (2)
So I realize this thread is controversial and a bit irrelevant since the useful data isnt there...but to my point
There were two sets of directions; one with PWM and one without. What are the effects, specifically of torque converter behavior of using the non-pwm wiring setup with only a single relay versus using the two relay pwm method? Should lockup basically be on/off and operate normally using the single relay, or are both needed for full torque converter lockup?
There were two sets of directions; one with PWM and one without. What are the effects, specifically of torque converter behavior of using the non-pwm wiring setup with only a single relay versus using the two relay pwm method? Should lockup basically be on/off and operate normally using the single relay, or are both needed for full torque converter lockup?
#50
He is a contract engineer for my company. I am a sponsor on the sister site. It is his intellectual knowledge that he took the time to develop for his own use. He also took the time to write up instructions for my customers. Rather than have my shop charge for the info and then have to defer any technical support to him I told him to charge directly on his end.
Edit: Confused two different usernames.
Another note:
I could easily distribute the information from my company and charge more for it and then pay his royalties. It costs the end user less if I don't have to charge for it, pay credit card fees, taxes, and overhead.
Last edited by Jake's Performance; 03-23-2012 at 03:12 PM.