PROJECTS GALLERY Vehicle builds | Engine Swaps | Conversions | Installation write ups |
Sponsored by:
Sponsored by: CARiD

My large frame front mount project with two videos

Thread Tools
 
Search this Thread
 
Old Feb 7, 2009 | 09:07 PM
  #61  
Wilde Racing's Avatar
Thread Starter
How do I change this text
iTrader: (26)
 
Joined: Jan 2005
Posts: 7,294
Likes: 2
From: Behind the TIG welder
Default

It's a S475 Budget unit...
Reply
Old Feb 8, 2009 | 03:57 PM
  #62  
ChevyTruck's Avatar
something else
iTrader: (39)
 
Joined: Jun 2008
Posts: 3,726
Likes: 1
From: Newark, DE
Default

Any updates?
Reply
Old Feb 8, 2009 | 04:04 PM
  #63  
Wilde Racing's Avatar
Thread Starter
How do I change this text
iTrader: (26)
 
Joined: Jan 2005
Posts: 7,294
Likes: 2
From: Behind the TIG welder
Default

I got the oil cooler some-what mounted...
Reply
Old Feb 8, 2009 | 04:15 PM
  #64  
vanillagorilla's Avatar
TECH Veteran
iTrader: (1)
 
Joined: Apr 2004
Posts: 4,038
Likes: 1
From: Arizona Bay
Default

You should prepare to move the A/C accumulator tank...or at least ditch it. That is if you've got the sand to run a full 5" DP all the way back.
Reply
Old Feb 8, 2009 | 04:36 PM
  #65  
OneQwikSS's Avatar
formerly 2004RST (changed 11/19/2012)
iTrader: (8)
 
Joined: Nov 2007
Posts: 1,275
Likes: 1
From: Spring Hill, FL
Default

she gon' be purty love to see front mounts on gas engines in trucks...all variables considered...our trucks kick ***
Reply
Old Feb 8, 2009 | 04:58 PM
  #66  
Wilde Racing's Avatar
Thread Starter
How do I change this text
iTrader: (26)
 
Joined: Jan 2005
Posts: 7,294
Likes: 2
From: Behind the TIG welder
Default

Originally Posted by vanillagorilla
You should prepare to move the A/C accumulator tank...or at least ditch it. That is if you've got the sand to run a full 5" DP all the way back.
The plan is to try to run the 5 inch down pipe down, then a 3 inch cutout. Then run as far back as I can with the 5 inch. I'll have to clearance a lot of sections with a hammer. The a/c accumulator will be one spot I'll have to make some room.
Reply
Old Feb 8, 2009 | 05:03 PM
  #67  
OnyxSilveradoSS's Avatar
TECH Fanatic
iTrader: (4)
 
Joined: Dec 2003
Posts: 1,069
Likes: 0
From: Detroit
Default

what exactly is budget$$?
Reply
Old Feb 8, 2009 | 08:29 PM
  #68  
XLR8NSS's Avatar
Adkoonerstrator
iTrader: (4)
 
Joined: Nov 2001
Posts: 21,436
Likes: 3
From: Deep in the seedy underworld of Koonerville
Default

I love this picture!



How are you planning on bringing split tubes into the turbo and still having room to run a 5" downpipe?
Reply
Old Feb 8, 2009 | 08:35 PM
  #69  
trever1t's Avatar
2nd fastest 5.3 ECSB
iTrader: (14)
 
Joined: Oct 2005
Posts: 26,690
Likes: 1
From: NorCal
Default

Originally Posted by XLR8NSS

How are you planning on bringing split tubes into the turbo and still having room to run a 5" downpipe?
you want him to brave reality...now? lol, love the chain holding that monster up!
Reply
Old Feb 8, 2009 | 08:46 PM
  #70  
Wilde Racing's Avatar
Thread Starter
How do I change this text
iTrader: (26)
 
Joined: Jan 2005
Posts: 7,294
Likes: 2
From: Behind the TIG welder
Default

Originally Posted by trever1t
you want him to brave reality...now? lol, love the chain holding that monster up!
LMAO, yea it might be a pipe dream... We'll see... I think I can but I have a few issues, I only have one 38mm waste gate, and I'd like to be able to remove the spark plugs some day... One thing is for sure... A hammer will be required to make the 5 inch fit...
Reply



All times are GMT -5. The time now is 04:29 PM.