My machine shop's complaint
#11
I wouldn't be concerned. You should be concerned if he didn't say something. By .020 out at a time means he not only took it easy on his machine, he was competent enough to not take alot out at one time. You gotta understand how the machine works that does it. It could deflect as it's cutting, and you get a oblong bore or big in some area and not in another by trying to get greedy with how much you take out. Problem with doing it right..is it takes all freakin day to take out that much material and he didn't get paid to run the machine and have a guy on it all day. So the complaint. But regardless of what he was being paid, he still did it right.
#12
I wouldn't be concerned. You should be concerned if he didn't say something. By .020 out at a time means he not only took it easy on his machine, he was competent enough to not take alot out at one time. You gotta understand how the machine works that does it. It could deflect as it's cutting, and you get a oblong bore or big in some area and not in another by trying to get greedy with how much you take out. Problem with doing it right..is it takes all freakin day to take out that much material and he didn't get paid to run the machine and have a guy on it all day. So the complaint. But regardless of what he was being paid, he still did it right.
#13
Dude, he's a human. I am a professional at my job. I complain. I complain alot. You can't name a human that wouldn't regardless of title. A professional will handle it correctly, by doing the best he or she can regardless of your feelings towards the moment or the person receiving it.
I totally agree. He took the job, but didn't realize what he was in for. You got off lucky probably. He was kinda hinting at a thanks, and a pat on the back for doing the job at his word on price, and taking the time to do it right.
I can't believe they take that block out to 4.00... I wonder how long it lasts. Definitely not a power adder combo!
Well, these guys really are pros and have been doing this for a looong time. I just don't think they do too many overbores like that. His complaint was really just about having the machine and one of his guys tied up for so long on this block, maybe he was just looking for a sincere thanks for doing it for the original agreed upon price. He didn't realize at first that he'd have to remove that much material. I have faith that they did it right but I'd like to check the wall thicknesses anyways. Some guys says the wall will be thin and some guys say that there will absolutely be no issue. Heck, one machinist on another site claimed that he'd bored several LM7's to 4.00"(!) and that they had more pin side thickness than an LQ9. But hearing stories about cracked walls makes me wonder...
I can't believe they take that block out to 4.00... I wonder how long it lasts. Definitely not a power adder combo!
#14
R
Your right,I was being a hard *** with the last statement.I have been raked over the coals by engines builders a few times in the past so forgive me.You really gotta be smart and jus not have faith here.Check the work with some proper measuring devices since it really is'nt too hard or exspensive.Just to give yourself some peice of mind.I actually enjoy doin stuff like this since it will give you a better understanding of engines and how they are affected by the build tolerences.
Dude, he's a human. I am a professional at my job. I complain. I complain alot. You can't name a human that wouldn't regardless of title. A professional will handle it correctly, by doing the best he or she can regardless of your feelings towards the moment or the person receiving it.
I totally agree. He took the job, but didn't realize what he was in for. You got off lucky probably. He was kinda hinting at a thanks, and a pat on the back for doing the job at his word on price, and taking the time to do it right.
I can't believe they take that block out to 4.00... I wonder how long it lasts. Definitely not a power adder combo!
I totally agree. He took the job, but didn't realize what he was in for. You got off lucky probably. He was kinda hinting at a thanks, and a pat on the back for doing the job at his word on price, and taking the time to do it right.
I can't believe they take that block out to 4.00... I wonder how long it lasts. Definitely not a power adder combo!
#15
12 Second Truck Club
iTrader: (7)
Joined: Jun 2006
Posts: 2,093
Likes: 0
From: colorado above 6000 ft.
yep I think just wanted more money, lol. Either that or next time he's just letting you know its gonna cost alot more. I have taken on lots of jobs I totally lost my *** on and have learned my lesson.
#16
Some days it sucks to be a machine shop. When my buddy had his L92's milled .060" the mill only took of .003 per swipe. It was a long day at the mill for a flat rate fee for somebody that day... I bet their pricing has changed since!
Last edited by MPFD; Jan 31, 2011 at 11:55 AM.
Thread
Thread Starter
Forum
Replies
Last Post
someotherguy
STEREO & ELECTRONICS
10
Oct 5, 2015 12:49 PM
KINGCYCLES
GM Parts Classifieds
1
Oct 2, 2015 10:21 AM
blown02408
GM Engine & Exhaust Performance
8
Oct 1, 2015 01:06 AM
lxcoupe
INTERNAL ENGINE MODIFICATIONS
4
Sep 11, 2015 03:17 PM
383, 53, address, block, complain, complaint, complaints, customer, dyno, machine, mechanical, motor, mymachineshopnet, rateing, shop








