my rebuild
#55
Driveshaft specialist is hands down the best company to deal with
Im waiting on a 3" 90 degree bend to come in so i can finish the Y pipe. I have my ball flanges cut to size, 1 welded on the passenger side. I also have the v band welded to the flex tube.
I have my driveshaft installed, next is to set the rear end and tack the leaf perches on. I still need to cut the old perches off.
The transmission filter is a dealer item and i waited too long friday to run and get one
List:
Transmission filter
Add water, bleed system
Prime oil system
Finish y pipe
Weld leaf perches
Get an air filter
Im waiting on a 3" 90 degree bend to come in so i can finish the Y pipe. I have my ball flanges cut to size, 1 welded on the passenger side. I also have the v band welded to the flex tube.
I have my driveshaft installed, next is to set the rear end and tack the leaf perches on. I still need to cut the old perches off.
The transmission filter is a dealer item and i waited too long friday to run and get one
List:
Transmission filter
Add water, bleed system
Prime oil system
Finish y pipe
Weld leaf perches
Get an air filter
#58
Pacesetter Y pipe. Took the ubolt style clamp off and welded it up. Not too bad for a rookie.
Got the oil system primed. I had 60psi but my phone didnt snap the pic fast enough.
Only thing left is to finish the Y pipe, leaf perches, get new u bolts, bleed the water system. Then 500 baby miles!