progress (pic's)
#1
Thread Starter
single digit dreamer
iTrader: (6)
Joined: Mar 2002
Posts: 9,743
Likes: 2
From: omaha ne
it's real dirty, cleaning really isn't my thing but i will spray it off once it is running.
something missing in this first pic. hot parts should be back to me soon with a monster 60mm waste gate.

steping up to twin meth nozles.

some pic's of the loops, i got these awhile ago but had to modify the rear ones because they were rubbing. should be ok now i hope.




the tranny blanket, not a lot of room on the drive shaft side so i had to run the straps under the shifter linkage. not ideal but it was the best i could figure out. my drive shaft is about 1/4" from the shifter so now way to go around it.



roll pan and toolbarn magnet

and last, the nittos, rims are suppose to ship this friday

i hope to be running this weekend, maybe even hit the dyno on saturday. roll bar sometime in the next 3 weeks. i had the converter turned up about 500rpm too so it should launch hard.
something missing in this first pic. hot parts should be back to me soon with a monster 60mm waste gate.
steping up to twin meth nozles.
some pic's of the loops, i got these awhile ago but had to modify the rear ones because they were rubbing. should be ok now i hope.
the tranny blanket, not a lot of room on the drive shaft side so i had to run the straps under the shifter linkage. not ideal but it was the best i could figure out. my drive shaft is about 1/4" from the shifter so now way to go around it.
roll pan and toolbarn magnet
and last, the nittos, rims are suppose to ship this friday
i hope to be running this weekend, maybe even hit the dyno on saturday. roll bar sometime in the next 3 weeks. i had the converter turned up about 500rpm too so it should launch hard.






